An epoxy flooring quotation is only useful if you can read it, and most homeowners and facility managers receive three documents that cannot be compared with each other. One bid says "garage floor epoxy, $1,650." Another lists grinding, moisture testing and a named topcoat. A third is a paragraph in an email. This guide shows how to get an epoxy flooring quotation that holds up, what belongs on it and how to line three of them up fairly. If you are still deciding on the system itself, start with our epoxy garage floor in Phoenix page.
Quick answer: A usable epoxy flooring quotation states the square footage, the surface prep method, the exact system and its thickness, the number of coats, the named topcoat product, moisture testing, the warranty term and the schedule. To compare quotes, rewrite all three into the same eight line items and mark every blank as unknown. The cheapest bid is usually the one with the most blanks, not the one with the lowest labor rate.
| Line item | What a complete quote says | Unit or reference | Red flag if missing |
|---|---|---|---|
| Area | Measured floor area, including any stem walls or steps | sq ft | "Standard two-car garage" with no measurement |
| Prep method | Diamond grinding to a stated profile | ICRI 310.2R CSP | "Surface prep included" or acid etching |
| Moisture testing | Test method and who reads it | ASTM F1869 or F2170 | No mention at all |
| System and thickness | Primer, base, broadcast and topcoat, with film build | mils (0.001 in) | The word "epoxy" and nothing else |
| Topcoat | Named product with a technical data sheet | Manufacturer product name | "Clear coat" or "sealer" |
| Repairs | Crack and spall repair priced or excluded in writing | Per linear foot or allowance | Silence on cracks |
| Warranty | Term, what it covers, what voids it | Years, in writing | Verbal warranty only |
| Schedule | Start date, days on site and return-to-service times | Days and hours | "We will get to it soon" |
This post is about reading the quote document, not about vetting the company that wrote it and not about how much a floor should cost. The interview questions are covered in our guide to choosing a Phoenix epoxy contractor, and the price ranges live in our Phoenix epoxy flooring cost guide. Here the question is narrower: once three envelopes are on the table, what do you do with them.
1. What a Complete Epoxy Flooring Quotation Contains
A complete epoxy flooring quotation describes a finished floor in enough detail that a different contractor could build the same one. If you could not hand the document to a second crew and get the same result, it is a price tag, not a quote.
The test is simple. Cover the dollar figure and read what is left. You should be able to tell what is being prepared, how, what goes on top of it and how long it should last. Many documents fail this test because they were written to win a phone call, not to be compared later.
Ask for the quote in writing even when the contractor offers a number over the phone. A number given at the curb, before anyone has measured the slab or checked for moisture, is an estimate in the loosest sense. It will move once the crew actually looks at the concrete, and you want to know in advance which direction and by how much.
A site visit matters more than a form on a website. A contractor who prices a floor without seeing it is pricing an average floor, and Phoenix slabs are not average. Garage slabs here range from smooth builder-grade concrete to surfaces with old paint, oil staining, tire marks and hairline cracks from heat cycling. Each of those changes the prep, and prep is where most of the labor and most of the quality difference sits.
When you request quotes, give every contractor the same information. Send the same measurements, the same photos, the same finish you want and the same timeline. Quotes built on different assumptions cannot be compared, and the easiest way to create that problem is to describe the job differently to each bidder.
2. The Eight Line Items That Should Always Be Itemized
Eight items should always be itemized: area, prep method, moisture testing, system and thickness, topcoat, repairs, warranty and schedule. If any of the eight is a blank on the quote, ask for it in writing before you compare prices.
Area and prep method
Area should be a measured number in square feet, not a room name. Prep method should say diamond grinding, and ideally the target surface profile. ICRI Technical Guideline 310.2R defines concrete surface profiles on a scale called CSP, and thin coatings and thicker broadcast systems call for different profile numbers. You do not need to memorize the scale. You only need the quote to name a mechanical method and say the profile is set by the coating manufacturer's data sheet.
Acid etching is the phrase to watch for. It is quicker and cheaper, and it leaves a shallower and less consistent profile than grinding. If grinding is not named, assume it is not included. Our concrete grinding and surface prep guide explains why this single line separates floors that last from floors that lift.
Moisture testing
Moisture is a common reason a coating fails years after it looks perfect. Concrete moves vapor upward, and a sealed surface traps it. Two standard tests exist: ASTM F1869 (calcium chloride) measures moisture vapor emission, and ASTM F2170 measures in-situ relative humidity inside the slab. A quote should say which test is used or that testing is part of the visit. Arizona slabs are often assumed to be dry, and that assumption is exactly why testing gets skipped. Our slab moisture testing guide covers what the readings mean.
System, thickness and topcoat
The system line should list each layer in order: primer, base coat, broadcast media if any, and topcoat. Thickness is measured in mils, one mil being one thousandth of an inch, and the coating manufacturer publishes the intended film build on the technical data sheet. A quote that gives no thickness hides the single biggest variable in the product. The topcoat line should name a product, not a category. In Phoenix the topcoat carries the UV and hot tire load, which is why our sealer and topcoat guide is worth reading before you decide what to accept.
Repairs, warranty and schedule
Repairs should be priced or explicitly excluded. Cracks, spalls and old control joints appear on almost every slab, and a quote that says nothing about them has either not looked or plans to bill for them later. The warranty line should state the term in years, what it covers and what voids it. The schedule line should give start date, days on site and when you can walk on the floor and drive on it. Our garage floor warranty guide covers what to look for in the wording.
3. Normalizing Three Quotes That Are Not Comparable
To normalize three quotes, rewrite each one into the same eight line items on a single page and write "not stated" wherever the document is silent. Then ask each contractor to fill in only the blanks, and compare again.
Do not average the prices or throw out the highest and lowest. Both of those methods assume the three documents describe the same product, and they usually do not. Normalizing is the step that turns three prices into three products you can actually choose between.
The table below shows an illustrative example for the same 440 square foot two-car garage. The figures are hypothetical and are not a ProEpoxy price list. The published residential range on our site is $3 to $7 per square foot installed, and a standard two-car garage typically falls between $1,800 and $2,800.
| Item | Quote A | Quote B | Quote C |
|---|---|---|---|
| Total price | $1,650 lump sum | $2,450 itemized | $3,000 itemized |
| Prep | Not stated | Diamond grind | Diamond grind, CSP stated |
| Moisture test | Not stated | Not stated | ASTM F1869 on site |
| System and mils | Epoxy, not stated | Epoxy and flake, not stated | Epoxy and flake, per data sheet |
| Topcoat | Clear coat | Polyaspartic, product not named | Named polyaspartic |
| Crack repair | Not stated | Excluded | Included up to an allowance |
| Warranty | Verbal | Written, term stated | Written, term and exclusions |
| Blanks out of 8 | 7 | 4 | 0 |
Quote A is not cheaper than Quote C. It is a different, unspecified product at a lower price, and the missing seven items are the ones that decide whether the floor is still bonded in three years. Quote B may be a fair offer once its four blanks are filled in. Quote C is the only one you can fully evaluate, which is itself a signal about how the company works.
After the blanks are filled, convert each total to a price per square foot by dividing by the measured area. This does not tell you which quote is right, but it tells you whether any quote sits far outside the published range for your type of floor. A figure well below the range deserves a question about what has been left out. A figure well above it deserves a question about what has been added.
4. Omissions That Make a Cheap Epoxy Quote Cheap
A low epoxy quote is almost always low because of what it leaves out, not because of efficiency. Three omissions account for most of the gap: mechanical grinding, moisture testing and a named topcoat.
Grinding takes time, equipment and dust control. Replacing it with a chemical etch or a light scuff saves hours and leaves a thinner bond. Moisture testing costs a small amount in materials and a visit, and skipping it saves that and nothing else. A named topcoat commits the contractor to a product with a data sheet, while "clear coat" lets them choose whatever is cheapest on the day.
Other omissions are quieter. Some quotes exclude removal of an existing coating, crack repair, or joint treatment, then add them as change orders once the crew is on site. Some use a thin roll-on coating with a handful of flake on top, which looks fine for a season and wears quickly under hot tires. Our guide to epoxy floor thickness in mils shows how film build changes durability, and our warning signs of a bad epoxy floor job post shows what the failures look like.
The cost of a skipped step rarely arrives on day one. It arrives the first summer a hot car sits on the floor, or the first time moisture pushes up through the slab. At that point the repair usually means grinding off the failed coating and starting over, which costs more than the original saving. That is the arithmetic behind a low bid: you pay the difference later, with interest.
5. Questions That Change the Number You Are Given
A handful of questions reliably change the price on an epoxy flooring quotation because they force the contractor to account for something they would otherwise leave out. These are about the document, not the company.
- Is this price based on a site visit? If not, ask what happens to the number after the visit.
- What happens if moisture testing fails? The answer should name a mitigation primer or a scope change, with a price or a method for pricing it.
- Is crack and joint repair included? Ask for an allowance or a per-foot rate in writing.
- Which product is the topcoat? Ask for the product name so you can read the data sheet.
- What is the film build in mils? A vague answer usually means the system has not been specified.
- Does the price include moving or protecting items in the garage? Labor on site is not always limited to the floor.
- What does the warranty exclude? Hot tire pickup, hydrostatic pressure and impact damage are common exclusions, so ask which apply.
You do not need to be an expert to ask these. You are not testing the contractor's knowledge, only checking that the quote says what the work will be. If an answer comes back as "do not worry about that," treat it as a blank and note it on your comparison page.
Timing matters as well. In the Phoenix valley the install window narrows in summer, and a quote that does not say when the work will be done may quietly assume early morning starts or a crew that is not yet booked. If your garage is the only space your vehicles have, confirm how many days the floor is out of service and what return-to-service looks like, since cure times shift with temperature and with the topcoat chemistry.
6. Deposit Terms, Change Orders and What to Sign
A deposit that covers materials is normal practice, while a request for full payment before work begins is not. The signed document should say what the deposit covers, when the balance is due and what happens to the deposit if the scope changes.
Read three clauses before you sign. The first is the change order clause, which says how added work is priced and approved. Ask that no extra work be done without written approval and a stated price. The second is the scope clause, which should refer back to the eight line items so the quote and the contract match. The third is the completion clause, which defines when the job is finished and who inspects it.
Keep the quote and the contract together, and make sure the contract does not quietly replace a named product with "equivalent material." Substitutions are sometimes legitimate when a product is discontinued, but the contract should require your approval first.
Licensing and insurance belong in the paperwork too, though they are covered more fully in our contractor guide. In Arizona, the Registrar of Contractors lets you look up a license by number, and a certificate of insurance should be issued to you on request. Check them before you pay anything, not after.
If cost is the obstacle, ask about payment terms openly rather than choosing a thinner system to hit a number. Our epoxy garage floor financing options guide explains how to spread the cost without cutting the prep. A properly specified floor paid over time is a better outcome than a thin one paid in full.
Finally, keep a record. Save the quotes, photos of the slab before work starts, the signed contract, the product data sheets and the warranty. If something goes wrong in two years, that folder is the difference between a warranty claim and an argument.